Proven & Probable Mineral Reserves

  PROVEN PROBABLE PROVEN AND PROBABLE
MINE/PROJECT TONNES (KT) GRADE (G/T) CONTAINED GOLD (KOZ) TONNES (KT) GRADE (G/T) CONTAINED GOLD (KOZ) TONNES (KT) GRADE (G/T) CONTAINED GOLD (KOZ)
Aurizona 16,581 1.39 740 15,749 1.82 920 32,330 1.60 1,660
Castle Mountain 84,910 0.55 1,498 172,990 0.48 2,670 257,900 0.51 4,168
Mesquite 34 0.79 1 30,264 0.48 470 30,298 0.48 471
Los Filos 35,453 0.77 877 157,773 0.88 4,477 193,226 0.86 5,354
RDM 11,681 0.96 360 5,872 1.04 196 17,553 0.99 556
Fazenda 5,319 1.57 269 1,335 1.09 47 6,653 1.47 315
Santa Luz 21,578 1.39 966 3,361 1.01 109 24,939 1.34 1,075
Greenstone 6,817 1.16 255 137,846 1.23 5,445 144,662 1.23 5,700
Total Proven & Probable     4,966     14,334     19,299

Measured & Indicated Mineral Resources (Exclusive of Reserves)1

  MEASURED INDICATED MEASURED AND INDICATED
MINE TONNES (KT) GRADE (G/T) CONTAINED GOLD (KOZ) TONNES (KT) GRADE (G/T) CONTAINED GOLD (KOZ) TONNES (KT) GRADE (G/T) CONTAINED GOLD (KOZ)
Aurizona 3,505 1.45 163 14,612 1.50 704 18,117 1.49 868
Castle Mountain 781 0.68 17 73,452 0.62 1,453 74,233 0.62 1,470
Mesquite 81 0.77 2 104,910 0.41 1,382 104,991 0.41 1,384
Los Filos 47,306 1.15 1,757 278,020 0.69 6,140 325,326 0.75 7,897
RDM 264 1.19 10 2,981 1.28 122 3,245 1.27 132
Fazenda 2,636 2.10 178 2,531 1.43 116 5,167 1.77 294
Santa Luz 10,107 1.23 398 6,475 2.41 502 16,582 1.69 900
Greenstone       29,967 2.30 2,218 29,967 2.30 2,218
Brookbank       3,428 5.45 600 3,428 5.45 600
Kailey       11,276 0.96 348 11,276 0.96 348
Key Lake       3,761 1.16 141 3,761 1.16 141
Hasaga       1,470 8.64 408 1,470 8.64 408
Total Measured & Indicated     2,525     14,134     16,660

1. Resources are exclusive of Reserves.

Inferred Resources

MINETONNES (KT)GRADE (G/T)CONTAINED GOLD (KOZ)
Aurizona12,6892.19895
Castle Mountain69,8900.631,422
Mesquite84,0300.34912
Los Filos135,9350.743,237
RDM3,6141.95226
Fazenda3,2831.50158
Santa Luz7,2542.09490
Greenstone26,3713.262,763
Brookbank7513.3080
Kailey4,8580.87136
Key Lake1,8391.3982
Hasaga2,0597.31484
Total Inferred  10,885

Notes to Mineral Reserves & Resources

CIM (2014) Definition Standards were followed for Mineral Reserves. Mineral Resources are inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Tonnage and grade measurements are in metric units. Contained gold is reported as troy ounces. Mineral resources do not include factors such as mining dilution or mining recovery. There is no certainty that the mine plans and economic models contained in any of the reports will be realized. Numbers may not add due to rounding. See Cautionary Notes on this website.

Details of cut-off grades, bulk densities, mining widths, dilution, mining factors, and process recovery assumptions applied to Mineral Reserves and Mineral Resources are provided in the Technical Reports for each mine/project. Unless otherwise stated, Mineral Reserve and Mineral Resource information for each project is summarized, derived, or extracted from the following respective reports:

  • For the Greenstone Mine: “Technical Report on the Greenstone Gold Mine, Geraldton, Ontario” prepared by G Mining Services dated October 1, 2024 with an effective date of June 30, 2024.
  • For the Mesquite Mine: “Technical Report on the Mesquite Gold Mine, Imperial County, California, U.S.A.” prepared by AGP Mining Consultants Inc., dated April 27, 2020 with an effective date of December 31, 2019.
  • For the Castle Mountain Mine: “Technical Report on the Castle Mountain Project Feasibility Study” prepared by M3 Engineering & Technology Corp. dated March 17, 2021 with an effective date of February 16, 2021.
  • For the Los Filos Mine: “Updated Technical Report for the Los Filos Mine Complex, Guerrero State, Mexico” prepared by AMC Mining Consultants (Canada) Ltd., dated October 19, 2022 with an effective date of June 30, 2022.
  • For the Aurizona Mine: “Technical Report on the Aurizona Gold Mine Expansion Pre-Feasibility Study” prepared by AGP Mining Consultants Inc. dated November 4, 2021 with an effective date of September 20, 2021.
  • For the Fazenda Mine: “NI 43-101 Technical Report on the Fazenda Brasileiro Mine, Bahia State, Brazil” prepared by Equinox Gold Corp. dated October 22, 2021, with an effective date of December 31, 2020.
  • For the RDM Mine: “NI 43-101 Technical Report on the Riacho dos Machados Gold Mine, Minas Gerais, Brazil” prepared by Equinox Gold Corp. dated October 22, 2021, with an effective date of December 31, 2020.
  • For the Santa Luz Project: “NI 43-101 Technical Report on the Santa Luz Project, Bahia State, Brazil” prepared by Equinox Gold Corp. dated November 30, 2020, with an effective date of June 30, 2020.
  • For the Hasaga Project: “Technical Report on the Hasaga Property” prepared by Equity Exploration Consultants Ltd. dated September 11, 2024, with an effective date of June 30, 2024.

The technical reports have been filed with Canadian securities regulatory authorities and are available for review on this website, on the Company’s profile on SEDAR+ at www.sedarplus.ca and on the Company’s profile on EDGAR at www.sec.gov/EDGAR.

Operating Mines

An Americas-focused gold producer

Equinox Gold has seven operating mines in the USA, Canada, Mexico and Brazil.

View our operating mines